Today, we completed Main Plant Stations 14 through 18. While there wasn’t a lot of ‘Action’ shots, there was a lot accomplished.

  • Lots of Quality Assurance inspections
  • TV / Video distribution / Surround sound testing / config
  • Cabinet doors installed
  • Pocket / hanging doors installed
  • Center overhead cabinet installed in Kitchen area
  • Final Slide Trim installed
  • Loads of touch-ups and more inspections…
  • Ceiling fan got its blades

Tomorrow, phase one rain test, then off to paint.

Video after the break!

Categories: The Build

Michael

Resident Tesla nut and polymath. Raised in eastern Kentucky, joined the US Navy at 19 to operate a Nuclear Reactor on a Fast-Attack submarine. After finishing his enlistment, Michael has continued to follow his passions in technology, astronomy, and of course, traveling the country.

3 Comments

mel · 2015-07-06 at 21:11

Very Nice! I’ve been waiting to see the shower. If I ever get my little RoadTrek it will be the baby.

Lynn · 2015-07-07 at 07:06

That’s a whole lot of upgrade from current coach! Wow, wow, wow…there’s some happily ever after gonna be happening when that gets delivered!! So happy for you both.

Blue · 2015-07-07 at 09:14

Fantastic!

Coincidentally – “Look at all that pretty natural cherry” was the title of my pornographic debut. But, alas, that was a different era.

Comments are closed.

MastodonLehnanne @ TurtleToot.usMichael @ TurtleToot.us