And…. we’re in!

By the time I returned from my Denver business trip, the new RV had already been delivered to Davis Motorhome Mart in Memphis!  (The day I flew back) So, Saturday morning, we packed up and rolled from Red Bay to Memphis and began moving in.  Tuesday, we were finished moving Read more…

Build day 14 – Interior status and paint touch-ups…

NOTE: This is the first video since Day 9.  I haven’t been able to be on-site since then, and won’t be on-site next week at all.  Our next video will likely be after Saturday the 25th.

In this video:

  • Interior status sweep
    • First look at the L shaped sofa
    • All cabinetry / woodwork installed
  • Chrome Cassette Steps
  • Blacking in the Outside TV Area
  • Misc paint touch ups
  • Removing all ‘Allegro Bus’ chrome lettering (didn’t care for the new font/placement)

Video after the break! (more…)

Build Day 8 – Paint!

Today… PAINT!

    • Base coat – Biarritz White
    • Primary Accent – Anthracite
    • Secondary Accent – Sunlit Sand
    • Top – Maroon

We got to name our paint scheme today… We call it.. Vegas Envy!!!

Tomorrow, we get more stripes on the rear of the back slide, touch ups on the other stripes, and our first coat of CLEAR!

Video after the break!

(more…)

Build day 7 – Sanding station 1 through 4, mask / wipe down

Special thanks to Blue Ajay for the use of his music in this video. Check out all his tunes at: http://sanitycheck.net/

Today ….

  • Sanding station 1 through 4
  • Masking and wipe down before paint

Tomorrow, we’re in for base coat paint at 6am CDT and we should have all the stripes on by the end of the day!

Video after the break

(more…)

A change of color…

So, after being on site for a few weeks, and seeing lots of coaches near the finish line.. we’ve decided to change a couple of things on our exterior colors. We don’t care for the way the fade is coming out in the stripe on the side of the coach, Read more…

%d bloggers like this: