Build Day 5 – Main Plant stations 14 through 18

Today, we completed Main Plant Stations 14 through 18. While there wasn’t a lot of ‘Action’ shots, there was a lot accomplished.

  • Lots of Quality Assurance inspections
  • TV / Video distribution / Surround sound testing / config
  • Cabinet doors installed
  • Pocket / hanging doors installed
  • Center overhead cabinet installed in Kitchen area
  • Final Slide Trim installed
  • Loads of touch-ups and more inspections…
  • Ceiling fan got its blades

Tomorrow, phase one rain test, then off to paint.

Video after the break!

3 Replies to “Build Day 5 – Main Plant stations 14 through 18”

  1. Very Nice! I’ve been waiting to see the shower. If I ever get my little RoadTrek it will be the baby.

  2. That’s a whole lot of upgrade from current coach! Wow, wow, wow…there’s some happily ever after gonna be happening when that gets delivered!! So happy for you both.

  3. Fantastic!

    Coincidentally – “Look at all that pretty natural cherry” was the title of my pornographic debut. But, alas, that was a different era.

Comments are closed.