Build Day 4 – Main Plant stations 10 through 13

Today, we completed Main Plant Stations 10 through 13. This included the following highlights:

  • Slide room trim
  • Fireplace install
  • Interior TV Installs
  • Under-dash trim
  • Driver’s side control panel
  • Most cabinet drawers
  • Cargo Bay Doors
  • Roof rail
  • Paramount Awnings
    and tons I’m sure that I’ve left off…

NOTE: Tiffin has all of next week off for Independence Day.  The next day of work on the rig will be July 6th, so no videos are likely to be uploaded until then… 🙂

Video after the break!

(more…)

Build Day 2 – Main Plant stations 1 through 4

Today was install of:Day2_Pano

  • AquaHot Hydraunic heating system (pre-main line)
  • All the basement side plumbing (Station 1)
  • Central Vacuum (Station 1)
  • Cargo area floors (Station 1)
  • Cargo area slide tray (Station 1)
  • Partial entry-step dressings (Station 1)
  • Power inverter / converter (Station 1)
  • Sub-floor (Station 2)
  • Floor heating elements (Station 2)
  • Powered step-well cover (Station 2)
  • Engine cover / walk-in closet floor (Station 2)
  • Ceramic tile floor (Station 3)
  • Half bath toilet (Station 3)
  • Shower (Station 4)
  • Master Bath Toilet (Station 4)
  • Various interior walls, cabinetry, etc (Station 4)
  • Dash (Station 4)
  • Stacked Washer/Dryer (Station 4) — installed after video ended.. sorry

Video after the break…

(more…)