Build Day 2 – Main Plant stations 1 through 4

Today was install of:Day2_Pano

  • AquaHot Hydraunic heating system (pre-main line)
  • All the basement side plumbing (Station 1)
  • Central Vacuum (Station 1)
  • Cargo area floors (Station 1)
  • Cargo area slide tray (Station 1)
  • Partial entry-step dressings (Station 1)
  • Power inverter / converter (Station 1)
  • Sub-floor (Station 2)
  • Floor heating elements (Station 2)
  • Powered step-well cover (Station 2)
  • Engine cover / walk-in closet floor (Station 2)
  • Ceramic tile floor (Station 3)
  • Half bath toilet (Station 3)
  • Shower (Station 4)
  • Master Bath Toilet (Station 4)
  • Various interior walls, cabinetry, etc (Station 4)
  • Dash (Station 4)
  • Stacked Washer/Dryer (Station 4) — installed after video ended.. sorry

Video after the break…

(more…)

Memorial Day

It’s very discouraging that there are many people wishing others a ‘Happy’ Memorial Day.  I could understand somewhat if these were all generated from outside the US, but even in America, the vast majority of citizens don’t understand the holiday.  Most think it’s just another day for firing up the Read more…